Sabic EDC Plant

Scope of work: Detailed design for the replacement of caustic headers for train 1 & 2 in the EDC plant.

Scope

  • Specification, Installation and Commissioning

Client

  • SABIC
Location
Location
Jubail
Location
Timeframe
2011 — 2011