Saudi-Bahrain 115 KM Pipeline Pre-FEED Study

Scope of work: Pre-FEED study to identify the scope of work to install a new pipeline with related facilities from Abqaiq plants to BAPCO to supply approximately 450 MBD of crude oil. We also completed a study to evaluate the current hydraulic limitations to operating the YR CDU at 235 MBD crude rate.
Scope
- Industrial Engineering Services
Client
- Saudi Aramco
Location
Timeframe