Salbouk and Buwayb Water Plant

Scope of work: Supply, installation & commissioning services for a new cooling tower for the National water company with a capacity of 400 M3/HR@4NOS. The project scope also included the demolition of existing cooling tower, concrete basin, piping network and electrical items.

Dar Al Riyadh was also responsible for the civil works for the cooling tower basin construction and installation of 120 M SS 12″ piping and 60 M DI 24″ required valves. We also supplied and installed the PLC based operation and control panel for fan motor. The scope also included supplying and installing all required instruments and cables for the fan motor.

Scope

  • Specification, Installation and Commissioning
  • Industrial Systems & Solutions

Client

  • National Water Company (NWC)

Partners

>
    Location
    Location
    Multiple Locations
    Location
    Timeframe
    2013 — 2014

    Related

    SIDCO Detergent Plant
    Dammam

    SIDCO Detergent Plant

    Dar Al Riyadh was responsible for the civil and structural design of the Plant, construction and erection of SABIZ tower, construction of civil foundations,…

    Saudi Aramco Corporate Data Center
    Dhahran

    Saudi Aramco Corporate Data Center

    The project scope includes engineering, design, supply and construction of cooling towers. The cooling towers are supplied with fiberglass structure which is in line…

    Saudi Aramco Al Ahsa Medical Facility AC Plant
    Al Ahsa

    Saudi Aramco Al Ahsa Medical Facility AC Plant

    The project scope includes engineering, design, supply and construction of cooling towers. The existing wooden cooling towers were replaced with fiberglass structures and…