Zamil Pipes Cooling Tower

Scope of work: Supply, installation, testing & commissioning of three cell SPX Marley cooling tower system to Saudi Seamless Pipes Factory Company (Zamil Pipes).

Our scope included complete cooling tower package including side stream filtration, pumping system, piping system and control panel with electrical cabling. The cooling tower serves chilled water to casing plant’s heat treatment building.

Scope

  • Specification, Installation and Commissioning
  • Industrial Systems & Solutions

Client

  • Zamil Pipes Co
Location
Location
Dammam
Location
Timeframe
2010 — 2010

Related

SIDCO Detergent Plant
Dammam

SIDCO Detergent Plant

Dar Al Riyadh was responsible for the civil and structural design of the Plant, construction and erection of SABIZ tower, construction of civil foundations,…

Saudi Aramco Corporate Data Center
Dhahran

Saudi Aramco Corporate Data Center

The project scope includes engineering, design, supply and construction of cooling towers. The cooling towers are supplied with fiberglass structure which is in line…

Saudi Aramco Al Ahsa Medical Facility AC Plant
Al Ahsa

Saudi Aramco Al Ahsa Medical Facility AC Plant

The project scope includes engineering, design, supply and construction of cooling towers. The existing wooden cooling towers were replaced with fiberglass structures and…